April 2017 - 7 phase office restructure project
April 2017 - 7 phase office restructure project

WNS were engaged by the client to work as part of a service team in a 7 phase office restructure in Swansea. This involved the relocation of cabling network for approximately 60 desks and the installation of new cabling to 20 desks. In total 320 Nexans Cat 6 cables were affected. The programme involved day, night and weekend work times to minimise staff disruption to this busy office.

READ MORE >>
March 2017 - 1000 new & 2000 existing outlets office consolidation for a broadcasting company
March 2017 - 1000 new & 2000 existing outlets office consolidation for a broadcasting company

WNS have recently completed the installation of 1,000 CAT6 U/UTP outlets at a broadcasting company in West London. This included all fibre backbone, switch links, frame & WAP installs. Plus 2000 existing infrastructure outlets were tested, fixed if necessary & validated as this was part of an office consolidation project.

READ MORE >>
January 2017 - Diagnose fibre fault and restore connectivity for 80 users in a remote building
January 2017 - Diagnose fibre fault and restore connectivity for 80 users in a remote building

WNS have recently been engaged to diagnose a faulty fibre optic cable which was thought to be limiting the service to 80 network users in a remote building. WNS staff performed extensive testing using an OTDR and determined that the cable had been badly damaged in a collapsed duct. The original fibre was of OM1 internal construction and therefore not suitable for a duct or consideration for repair. WNS have subsequently replaced the fibre with a new 12 core Brand Rex OM4 Loose tube duct grade cable which has restored full network connectivity to the building.

READ MORE >>
December 2016 - 3000 Cat6a F/FTP outlets in a research facility in Oxfordshire
December 2016 - 3000 Cat6a F/FTP outlets in a research facility in Oxfordshire

WNS have recently completed the installation of 3,000 Cat6a F/FTP outlets over 4 floors, plus an extensive fibre & copper backbone and all MER interlinks at a new research facility in Oxfordshire.

READ MORE >>
November 2016 Excel Cat6 install in Bedfordshire
November 2016 Excel Cat6 install in Bedfordshire

WNS recently completed the installation of 700 excel Cat6 outlets over 3 floors in an occupied office environment in Bedfordshire. All works were completed on time as per programme.

READ MORE >>
Aug 2016 - Network cabling at school
Aug 2016 - Network cabling at school

WNS have successfully installed 202 Cat6 outlets across a school in the South East. The installation was completed within the timescales to meet the refurbishment project deadlines.

READ MORE >>
Aug 2016 - Structured cabling installation in Stockholm
Aug 2016 - Structured cabling installation in Stockholm

WNS have successfully installed 397 Cat6 outlets, cabinets and copper and fibre backbone links in offices located in Stockholm. The engineers completed the installation within  a 10 day trip.

READ MORE >>
Aug 2016 - Celebrating 10 years preferred LAN infrastructure supplier for SW London local authority
Aug 2016 - Celebrating 10 years preferred LAN infrastructure supplier for SW London local authority

WNS have been installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 10 years. This status was extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.

READ MORE >>
Aug 2016 - 10,000 Cat6A outlets installed for major financial institution in London
Aug 2016 - 10,000 Cat6A outlets installed for major financial institution in London

WNS have recently successfully completed the first 5 floors of a refurbishment project for a major financial institution in London. Over 10,000 CAT6A U/UTP outlets were installed within the project timescales.

READ MORE >>
Aug 2016 - 600 Cat6A F/FTP outlets installed - phase 1 of a refurb project
Aug 2016 - 600 Cat6A F/FTP outlets installed - phase 1 of a refurb project

WNS have recently completed the installation of 600 CAT6A F/FTP horizontal outlets in London for a major interactive software company. This is the first phase of two to be undertaken to avoid any disruption to the clients business as usual.

READ MORE >>
May 2016 - Top Safety Accreditation for WNS Network Services - 7th year running
May 2016 - Top Safety Accreditation for WNS Network Services - 7th year running

WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 7th year running.

safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.

READ MORE >>
March 2016 - Hospital ward refurbishment - TE Connectivity
March 2016 - Hospital ward refurbishment - TE Connectivity

WNS have successfully completed the installation of 350 TE CAT6 outlets at a hospital in the South East as part of a phased ward refurbishment project.

READ MORE >>
March 2016 - Zurich structured cabling project
March 2016 - Zurich structured cabling project

WNS have successfully completed a structured cabling project for a UK client at their offices in Zurich. WNS engineers installed 104 Cat6 outlets, 5 copper backbone links, cabinets and frames within a 5 day trip to meet the clients timescales.

READ MORE >>
March 2016 - Vienna structured cabling project
March 2016 - Vienna structured cabling project

WNS successfully completed a structured cabling project for a UK client at their offices in Vienna.

WNS engineers installed 140 Cat6A Commscope outlets at high level for AV, security and user outlets. The project was completed within 6 days to meet the clients timescales.

READ MORE >>
December 2015 - 340 site wifi roll-out installation completed within 14 weeks
December 2015 - 340 site wifi roll-out installation completed within 14 weeks

WNS have successfully scheduled and completed a 340 site wifi roll-out project within 14 weeks to meet the customers timescales. WNS's engineers installed the cabling infrastructure and 2 to 6 wireless access points on each site depending on the size of the building. Each morning the documentation for each site completed that night was submitted to the client.

The installation was completed out of normal working hours because some of the WAP's were located in public areas.

READ MORE >>
December 2015 - ongoing nationwide cabling refurbishment project
December 2015 - ongoing nationwide cabling refurbishment project

WNS have successfully installed a new structured cabling system in 64 sites throughout 2015 as part of an ongoing refurbishment project for a client with nationwide offices. Each site was completed on time working to the clients program which ranged from 1 weekend to 5 or 6 week to fit in with the builders refurbishment works, all the installation works were completed out of normal working hours. The staff were migrated on to the new cabling system during the phased installation and the existing cabling system was decommissioned.

READ MORE >>
December 2015 - Brand Rex Cat6 installation on tight timescales
December 2015 - Brand Rex Cat6 installation on tight timescales

WNS successfully completed the installation of 1016 Cat6 Brand Rex UTP cables fed from 3 zones. A new Prism 47u 800 x 800 cabinet was installed in each zone and was fed by a  16 core fibre and 150 pair voice links from the MER.  

The installation was completed within very tight timescales to suit the clients program of works.

READ MORE >>
September 2015 - 4000 Systimax Cat6a outlets
September 2015 - 4000 Systimax Cat6a outlets

WNS have successfully completed the installion of a new structured cabling system for an international finance company over 2 sites simultaneously in the South East.

WNS installed 4,000 Cat6a horizontal outlets, fibre & copper backbone, data centre links & all the client migration patching.

READ MORE >>
September 2015 - 340 site wifi cabling surveys
September 2015 - 340 site wifi cabling surveys

WNS have recently completed 340 site surveys for a wifi installation rollout project starting this week that will be completed within 3 months.

READ MORE >>
May 2015 - Cat6 Brand Rex install in Cardiff
May 2015 - Cat6 Brand Rex install in Cardiff

WNS successfully complete a Brand Rex Cat6 structured cabling installation in Cardiff

  • 3 x 47U cabinets.
  • Extend existing 16 core fibres to each new cabinet.
  • Extend existing multicore cables to each new cabinet.
  • Install 16 Cat 6 links between cabinets.
  • Install 654 Cat 6 outlets to floor boxes.  
READ MORE >>
May 2015 - Well done to the Ely Rangers junior team this season
May 2015 - Well done to the Ely Rangers junior team this season

Well done to the Ely Rangers junior team this season, PROUD to sponsor you.

READ MORE >>
April 2015 - Top Safety Accreditation for WNS Network Services - 6th year running
April 2015 - Top Safety Accreditation for WNS Network Services - 6th year running

WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 6th year running.

safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.

READ MORE >>
Dec 2014 - WNS qualify for Constructionline H&S scheme - 7th year
Dec 2014 - WNS qualify for Constructionline H&S scheme - 7th year

WNS is proud to announce we have passed the Constructionline pre-qualification process for the seventh year running. Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.

READ MORE >>
Dec 2014 - 6 floor cable removal project
Dec 2014 - 6 floor cable removal project

WNS has recently completed the removal of all the existing IT cables across 6 floors of a large office building in preperation for the new cabling system to be installed in Q1 2015.

READ MORE >>
Dec 2014 - 1200 Commscope outlets in Peterborough
Dec 2014 - 1200 Commscope outlets in Peterborough

WNS have successfully completed the installation of 1,200 Commscope CAT6 horizontal outlets plus backbone & links at a major credit card company in Peterborough

READ MORE >>
Ely Rangers junior team sponsorship 2014-2015 season
Ely Rangers junior team sponsorship 2014-2015 season

WNS are proud to be sponsoring the Ely Rangers junior team for the 2nd consecutive season.

Photo of the team in their new kit with WNS project manager John Kelly.

READ MORE >>
Sept 2014 - TE Connectivity IT cabling restructure over 6 months
Sept 2014 - TE Connectivity IT cabling restructure over 6 months

WNS have been engaged by a major UK energy supplier to carry out the IT cabling restructure in conjunction with the major refurbishment of the clients national control centre in Suffolk. This project is planned to take approximately 6 months and involves the relocation of staff in phases from the control centre to temporary premises to allow for the refurbishment works to take place in each respective area. WNS are required to fit out the temporary premises with a suitable LAN infrastructure along with the moving, adding to and changing of the existing infrastructure in the control centre to suit the revised office and desk plans. All new and existing LAN infrastructure cabling is TE branded keeping in line with the clients stringent quality requirements.

READ MORE >>
Sept 2014 - Brand Rex cabling project in Carmarthen
Sept 2014 - Brand Rex cabling project in Carmarthen

WNS have installed 300 Cat6 outlets, 2 x 47U cabinets, fibre & multicore links to three floors of a government building in Carmarthen, this was to establish a decant area in the building. Cat6 cabling , 8 x cabinets fibre & multicores links will then be installed throughout the 3 floors on a scheduled programme of work.

READ MORE >>
Aug 2014 - IT cabling in Aberystwyth
Aug 2014 - IT cabling in Aberystwyth

WNS have successfully re-located an existing cabinet, including 200 Cat6 cables, fibre & multicore links at a government building in Aberystwyth.

READ MORE >>
Aug 2014 - IT cabling in a hospice
Aug 2014 - IT cabling in a hospice

WNS have installed 286 Cat6 cables to a hospice located in Hereford.

READ MORE >>
Aug 2014 - Structured cabling for car manufacturer HQ
Aug 2014 - Structured cabling for car manufacturer HQ

WNS have completed the installation of a new structured cabling system for the new HQ of a large car manufacturer in West London.

WNS installed 1,200 horizontal outlets, fibre & copper backbone all within the clients project plan with no issues.

READ MORE >>
Aug 2014 - Celebrating 8 years preferred LAN infrastructure supplier for SW London local authority
Aug 2014 - Celebrating 8 years preferred LAN infrastructure supplier for SW London local authority

WNS have been installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 8 years. This status has now been extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.

READ MORE >>
July 2014 - 340 site rollout completed in 3 months
July 2014 - 340 site rollout completed in 3 months

WNS has successfully completed a wifi cabling installation across 340 sites within 3 months, the installations were completed out of normal working hours with up to 5 teams completing 3 sites each per night.

READ MORE >>
July 2014 - WNS awarded 2nd phase of airport project
July 2014 - WNS awarded 2nd phase of airport project

WNS have been awarded another 2 floors at a UK airport because we successfully delivered a similar size project in late 2013.

We are to install over 3,000 horizontal TE Connectivity CAT6 outlets, fibre & copper backbone within the building over a 12 week project.

We will be installing all cabling out of hours to limit disruptions to other trades.

READ MORE >>
July 2014 - WNS awarded a new LAN project with 4km of fibre optic cable
July 2014 - WNS awarded a new LAN project with 4km of fibre optic cable

WNS have been engaged to provide a new campus LAN for a major utility company site restoration project in South London. This project will take place over the next 9 months and involves the installation of approximately 4km of duct grade TE OM3 optical fibre cable and over 600 category 5e UTP network outlets. The optical fibre backbone will serve the LAN and CCTV system which is extensive across this large site and the UTP outlets will be split across 3 buildings one of which is a new build.

READ MORE >>
May 2014 - New toy Fluke DSX5000
May 2014 - New toy Fluke DSX5000

WNS has added the Fluke DSX5000 to our range of cable analysers.

READ MORE >>
May 2014 Optical fibre testing - Government airbase
May 2014 Optical fibre testing - Government airbase

WNS has been awarded a contract to test the optical fibre backbone network across a government airbase.

READ MORE >>
May 2014 - Another Brand Rex installation
May 2014 - Another Brand Rex installation

WNS has been awarded the next phase of a government building refurbishment. The project involves the installation of 1,500 Brand-Rex Cat6 outlets to floor boxes throughout the 4th floor west & south wings. The cables will be routed to 6 No new 47U cabinets. The existing 16 core fibres that originally served the old redundant cabinets will be re-routed and extended (via fusion splice boxes) to their new locations. The original 100-pair multicore cables that also served the old cabinets will also be re-routed and extended (via box cons) to their new locations. 

READ MORE >>
March 2014 - WNS maintains UVDB verification status
March 2014 - WNS maintains UVDB verification status

WNS Network Services has passed the rigorous qualification process to continue it's UVDB verification status.

About UVDB (powered by Achilles)

We are a leading global provider of integrated supplier management and supply chain solutions.

READ MORE >>
March 2014 - Top Safety Accreditation for WNS Network Services - 5th year running
March 2014 - Top Safety Accreditation for WNS Network Services - 5th year running

WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 5th year running.

safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.

READ MORE >>
February 2014 - WNS qualify for Constructionline H&S scheme 6th year
February 2014 - WNS qualify for Constructionline H&S scheme 6th year

WNS is proud to announce we have passed the Constructionline pre-qualification process for the sixth year running. Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.

READ MORE >>
January 2014 - 1950's refurb in Camden with TE structured cabling install
January 2014 - 1950's refurb in Camden with TE structured cabling install

As part of a staff consolidation process from rented office space to owned office space, one of the UK’s largest power distribution companies has committed to the re-furbishment of one of their buildings in Camden, North London. The fit-out will take in five floors of owned office space which will be bought up to modern day standards from its current 1950’s décor. WNS have been engaged to supply and install a new TE structured cabling system to include up to 800 LAN sockets and an OM3 optical fibre backbone between communications rooms. WNS are helping with the cabling and containment design by providing the services of their RCDD staff member to ensure the installation meets current international and European Standards. Building works have begun on site and it is anticipated that WNS will be required on site to begin cabling towards the end of February 2014. The client’s staff are due to move in in early July 2014 and WNS will provide staff to assist with the relocation of personnel and their IT kit from the rented office space as part of an overall service.

READ MORE >>
November 2013 - High profile substation for crossrail project
November 2013 - High profile substation for crossrail project

As part of a major electrical substation upgrade directly related to the crossrail project, WNS have been appointed to install new Connectix category 6a cabling throughout the premises for LAN and voice connectivity. The substation has 5 sub level floors and 2 comms rooms which WNS will link together with OM3 fibre and voice connections. This site is extremely high profile and is subject to the most challenging health and safety restraints due to the nature of the premises. WNS are on target to complete this work on time and on budget.

READ MORE >>
October 2013 - Ely Rangers new kit
October 2013 - Ely Rangers new kit

WNS Network Services is very proud to sponsor the Ely Rangers under 8's team.

Looking very smart in their new kit.

READ MORE >>
October 2013 - CCTV installation
October 2013 - CCTV installation

WNS has recently completed a CCTV installation for a residential block in Tower Hill, London. The cameras installed range from entry level analogue units to ingress protection rated High Definition internet protocol cameras with integrated heating circuits to prevent moisture during the wet winter months. The majority  of the cameras used were supplied by Genie CCTV systems with whom WNS have now formed a partnership. WNS have installed a whole new TE UTP infrastructure to serve the cameras which is completely contained in a combination of PVC and steel galvanized conduit whose junction boxes are fitted with tamperproof security screws. To capture the recordings of the camera network a new 2TB AVER hybrid network video recorder capable of handling a combination of 20 analogue and IP cameras was installed. The NVR connects to a network switch supplied and installed by WNS to allow for the IP cameras to function. All active kit is connected to the internet via a new BT broadband circuit to allow the customer to view and interrogate the system remotely from any PC, Android, IPhone or Ipad device.

READ MORE >>
September 2013 - WNS proud to sponsor Ely Rangers
September 2013 - WNS proud to sponsor Ely Rangers

WNS is proud to announce it is sponsoring the Ely Ranger under 8's football team.

Ely Rangers Association Football Club are a Welsh Association football team founded in 1965. They are based in Ely, Cardiff and they play at Station Road.

READ MORE >>
August 2013 A sensitive installation in Cardiff Bay
August 2013 A sensitive installation in Cardiff Bay

WNS are currently undertaking the refurbishment of 2 floors within an office building in Cardiff Bay.

Due to the sensitivity of the offices and the security 90% of the work was carried out outside of normal working hours.

READ MORE >>
August 2013 - Carbon Neutral status for Brand Rex
August 2013 - Carbon Neutral status for Brand Rex

WNS are proud to be associated with Brand Rex as they recently announced that their global organisational and operational activities achieved Carbon Neutral Status in accordance to PAS2060 - a new carbon neutrality standard launched by the British Standards Institute (BSI), developed with input from government, public and the private sector. 

READ MORE >>
July 2013 - Brand-Rex training
July 2013 - Brand-Rex training

WNS engineers have recently completed their Brand-Rex Design and technician refresher courses.

READ MORE >>
July 2013 - Wifi connectivity for Energy provider HQ in London
July 2013 - Wifi connectivity for Energy provider HQ in London

WNS recently completed an installation for a UK Energy distributor, providing WIFI connectivity for staff over 6 floors of the Company HQ building in London.  WNS Engineers installed a total of 50 Cat5e UTP cables supplying 2 outlets per WIFI device (one cable for primary use and the secondary as a backup)  Engineers installed 25 Cisco WIFI Access Points mounting them to the ceiling grid within their given areas of use.

READ MORE >>
June 2013 - Wifi survey & install roll out across the South of England and Wales
June 2013 - Wifi survey & install roll out across the South of England and Wales

WNS is currently surveying multiple sites across the South of England & Wales for a Wifi connectivitiy installation project, the wireless access points will be installed out of normal business hours in July and August. The Wifi connectivity will enable the client to offer a more flexible service within it's sites.

READ MORE >>
May 2013 - Substation Entry level training
May 2013 - Substation Entry level training

WNS London based project manager Leigh Marshall has completed his Substation Entry Level Training Course. The training was undertaken due to the large number of structured cabling projects WNS undertake within this sector and the need to increase our number of management staff and engineers with Certificates of Competence for carrying out work activities in substations. 

READ MORE >>
May 2013 - Production Company
May 2013 - Production Company

WNS continue to build & strengthen their relationship with a London based Production Company and is currently carrying out the following works on one of their sites in London.

  • Structured Cabling ‘Health Check Remedy’ – following recent testing onsite, WNS are replacing a number of faulty or broken data outlet modules and shutters, rectifying faults & re-testing failed outlets on their existing network.
  • Supply & installation of a new structured cabling system in one of the departments
  • Supply & installation of a Fibre Optic Single Mode Patch Lead uplink between the  Ground & 3rd Floor Comms Rooms to improve connectivity
READ MORE >>
May 2013 - Public sector - Mid Wales structured cabling project
May 2013 - Public sector - Mid Wales structured cabling project

WNS have been awarded the contract to undertake the installation of 3 No new 42U cabinets, 700 Brand Rex Cat6 outlets, new fibre and multicore links between floors for a Government Office in Mid Wales.

The contract was awarded after WNS attended various site surveys and planning meetings. Some phases of the project will be undertaken outside of normal working hours to minimise disruption to the staff.

READ MORE >>
May 2013 - College cabling in listed building
May 2013 - College cabling in listed building

WNS have recently engaged with a new client in central London. The client is a prestigious college who currently occupy a number of listed buildings which require a great deal of thought and care even for the smallest installations. WNS recently completed a 4 day project which involved fitting out one of the buildings with a new Excel structured cabling solution. Every outlet on this job required containment of some description to achieve a discrete finish that blends in with the building surrounds. This project was completed on time and within budget and has provided a solid foundation for our new relationship going forward.

READ MORE >>
May 2013 - A quiet installation SSSHHH!
May 2013 - A quiet installation SSSHHH!

WNS have completed an installation in central London for a major UK Energy provider comprising of 336 TE Cat5e LAN outlets and a sprinkling of wireless access points. Due to an aggressive time scale and noise restrictions on this project, WNS staff were required to complete a good deal of the work outside of normal business hours. To achieve authorisation for out of hours works, dispensation and permits were required and arranged in advance with the building manager. The end result was a happy customer and a satisfied building manager.

READ MORE >>
May 2013 - Clocking in/out Kiosk connectivity - rollout project
May 2013 - Clocking in/out Kiosk connectivity - rollout project

WNS is currently involved in a large rollout project providing LAN connections for clocking in/out Kiosk Machines. The Kiosk Machines are used by staff to log-in and enter their details when they arrive and leave the premises. 

READ MORE >>
April 2013 - Orange Aerial Booster cabling
April 2013 - Orange Aerial Booster cabling

WNS recently completed an installation for a UK Energy provider which involved providing a LAN connection for an Orange Mobile Aerial Booster and the supply and installation of TE Connectivity Cat5e UTP cables for a Portakabin Meeting Room.

 

READ MORE >>
April 2013 - Global Law Firm London Offices - Moves / Adds & Changes Project

WNS are currently involved in a project at a prestigious law firms London Offices.

WNS engineers are working night shifts to convert & relocate information outlets throughout the building ensuring connectivity before the staff returned to their new desk position in the morning.

READ MORE >>
April 2013 - Utility Sector - Measuring & Calibration

WNS has successfully completed a new structured cabling installation at a site in the South East. The project was for the refurbishment of the Measuring & Calibration Centre providing the following:

  • 1 x 42U Cannon Smart Data Cabinet
  • 246 x UTP Cat5e TE Connectivity LAN outlets
  • 4 x UTP Cat5e outlets (for WIFI Connectivity)
  • 2 x 12core OM3 fibre links from Main Building & IT Stores to MCC Building
  • 100pair CW1308 voice link from Main Building
READ MORE >>
April 2013 - Infrastructure Health Check for Production Company
April 2013 - Infrastructure Health Check for Production Company

WNS have completed a Network cabling Infrastructure Health Check across four floors for a Production Company based in London.

 

READ MORE >>
March 2013 - Utility sector - Cyber Lock digital keys
March 2013 - Utility sector - Cyber Lock digital keys

WNS are currently involved in a site roll out project for a UK Energy provider within the East and South of England, including the London area.

The project is to replace Sub Station Entry Keys with a Digital Key to allow the business to control the access to its sites through restrictions and monitoring.  WNS are involved providing a LAN connection to a modem that controls a Digital Key Reading Device. The Key Reader is used by staff  to register and then regularly charge their new Digital Keys for access to their designated sites.

READ MORE >>
Top Safety Accreditation for WNS Network Services
Top Safety Accreditation for WNS Network Services

WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety.

safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.

READ MORE >>
March 2013 - WNS Health & Safety training

WNS take our engineer Health & Safety training very seriously - IPAF / PASMA / First Aid / CSCS / SMSTS / SSSTS / Asbestos awareness & Confined space training

READ MORE >>
March 2013 - Public Sector - Office refurb

WNS Network Services have successfully completed the installation of 1,472 Brand Rex Cat6 outlets, 3no. new 47u cabinets, relocation of 2no. existing cabinets, 5no. 16 core fibre optic cables and 5no. 100 pair CW1308 voice backbone cables. All client expectations were met.

 

READ MORE >>
February 2013 - Kevin Ward Returns to WNS

WNS are pleased to announce that Kevin Ward has returned to us after a year off travelling the world. Kevin has taken up where he left off as a Project Manager and he will be based in West Somerset overseeing projects across the South of England and Wales.

READ MORE >>
February 2013 - Kevin Ward BICSI RCDD Qualified

WNS are proud to announce that Kevin Ward is now a qualified BICSI Registered Communications Distribution Designer (RCDD)

 

READ MORE >>
January 2013 - New website and Company logo

WNS Network Services are proud to announce the launch of their new website and logo. We would like to thank Sinclair Knight for all their help designing and launching the site.

READ MORE >>
August 2012 - Article from Brand News Summer Edition
August 2012 - Article from Brand News Summer Edition

Brand-Rex Select Partner Whitepack Network Services has recently completed a project to successfully design and install a Brand-Rex Cat6Plus system into the Welsh governments new office in London. 
The office in the building of the former headquarters of the Conservative Party in Victoria Street, London required a reliable network capable of running the latest technologies such as video and web conferencing as well as providing staff with high-speed internet access. 
Prior to commencing the installation, Whitepack Network Services assisted with the IT infrastructure design, recommending a Brand-Rex Cat6Plus solution to ensure the new network infrastructure would meet the needs of the Welsh government. 
The office, officially opened at the end of July by the Welsh First Minister.

READ MORE >>
July 2012 - Industry News - CAT6PLUS F/UTP Boxed Cable
July 2012 - Industry News - CAT6PLUS F/UTP Boxed Cable

New Product – CAT6PLUS F/UTP Boxed Cable 
Brand-Rex is delighted to launch the first ever Cat6Plus F/UTP data communication cable in 305m boxes using REELEX® tangle free, easy pull packaging technology. The combination 
of boxed cable and REELEX® packaging now make it easier for users to manage, handle and install the cable on site.
The new installer friendly boxed cable eliminates the need for cable reel stands on site and the robust packaging and ergonomic box design ensures this shielded cable is now easier than ever to handle, transport and to stack and store. 
Cat6Plus is the best performing Category 6 / Class e products available on the market today. This premium grade shielded cable support gigabit ethernet protocols and is ideal for installation in horizontal or building backbone areas.

READ MORE >>
May 2012 - Article from Brand News Spring Edition
May 2012 - Article from Brand News Spring Edition

Brand-rex Partner whitepack network services have successfully designed and installed a cat6Plus system for the newly refurbished Welsh Assembly Government buildings in Cardiff. WNS were appointed to manage the design and install by fujitsu last year.
The buildings at Cathay’s Park, Cardiff required a reliable network capable of running the latest technologies such as video and web conferencing as well as providing staff with high-speed internet access. Prior to starting, WNS assisted with the IT infrastructure design and made recommendations to ensure the new network infrastructure would best meet the needs of the Welsh Assembly Government. The existing Category 5 cabling was stripped out from beneath the raised floors then replaced with the Cat6Plus system. The optical fibre patch panels were then replaced with new Brand-Rex patch panels and the existing optical network reconfigured using fusion-splicing onto pre-terminated multimode pigtails and ST connectors to reduce signal loss and deliver higher transmission speeds. 
The project involved over 1,500 cables and 408 quad outlets to floor boxes with a combined length of more than 55,000m.

READ MORE >>
April 2012 - Public sector - Office upgrade
April 2012 - Public sector - Office upgrade

WNS has successfully completed the Installation of 1,034 Cat6 Brand-Rex outlets, backbone cabling and Prism cabinets in Wales for a local government

READ MORE >>
March 2012 Powerstations go Wireless
March 2012 Powerstations go Wireless

WNS have installed a wireless network in three Power stations located in the South East of England enabling remote and flexible access for staff.

READ MORE >>
February 2012 - Leigh Marshall joins the Management team
February 2012 - Leigh Marshall joins the Management team

WNS are pleased to announce Leigh Marshall has joined the Project Management team.
Leigh was previously a Senior site supervisor for WNS with 10 years experience in the IT industry. Leigh will be involved with managing structured cabling installation projects & maintaining relationships with our clients & Suppliers.

READ MORE >>
February 2012 - WNS Qualify for the SAFEcontractor Health & Safety scheme - 2nd year
February 2012 - WNS Qualify for the SAFEcontractor Health & Safety scheme - 2nd year

WNS has passed the pre-qualification process for the SAFEcontractor scheme.

About SAFEcontractor -
With more than 150 major clients and almost 18,000 contractor members, SAFEcontractor is the fastest growing health and safety assessment scheme in the UK.
As a leading health and safety pre-qualification assessment scheme, we are dedicated to promoting higher standards of competence and compliance through the provision of relevant industry specific and tailored health and safety assessments for all professions and sectors.

READ MORE >>
January 2012 - ADC Krone is now TE Connectivity
January 2012 - ADC Krone is now TE Connectivity

TE Connectivity is a global, $12.1 billion company that designs and manufactures over 500,000 products that connect and protect the flow of power and data inside the products that touch every aspect of our lives.

As a world leader in network infrastructure, TE Enterprise Networks develops solutions for data critical applications in buildings, on campus and within data centers TE Enterprise Networks brings together the best from AMP NETCONNECT and ADC KRONE to help you ensure that your network never lets you down by providing tailor-made solutions to match your business no matter where your operations are based.

READ MORE >>
December 2011 - WNS Qualify for the Constructionline H&S scheme 4th year
December 2011 - WNS Qualify for the Constructionline H&S scheme 4th year

WNS have passed the Constructionline pre-qualification process for the fourth year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.

READ MORE >>
October 2011 - Public Sector - Regional office
October 2011 - Public Sector - Regional office

WNS have successfully completed the installation of 512no. Brand Rex Cat6 cables, plus fibre optic and voice cable backbone within timescale for a Government regional office.

READ MORE >>
September 2011 - Private Sector - Global Law firm goes Wireless
September 2011 - Private Sector - Global Law firm goes Wireless

WNS have successfully completed the installation of 165no. wireless access points across 18 floors of two buildings. All the work was completed out of normal business hours. The project involved meticulous planning and tight timescales to ensure that the business was not put at any risk. The project was completed on time with positive reports posted by all involved on the client’s IT team with whom WNS were working closely with throughout the project.

READ MORE >>
August 2011 - John Cunningham joins the Management team
August 2011 - John Cunningham joins the Management team

WNS are pleased to announce that John Cunningham has joined the Project Management team.
John was previously a Senior site supervisor for WNS with 17 years experience in the IT industry. John will be involved with managing structured cabling installation projects & maintaining relationships with our clients & Suppliers.

READ MORE >>
July 2011 - S4C Television centre
July 2011 - S4C Television centre

WNS recently installed ADC Krone Cat 6 cabling and Brand Rex optical fibre cables at S4C Television centre.
134 Krone Cat 6 outlets were installed from a new cabinet to floor boxes and dado trunking on the ground floor. The existing 40 Cat cables were disconnected and re-routed to new locations, 4 x 12 port Cat 6 harness links were installed between the new cabinet in the Edit Car Room. 
16 core OM1 Brand Rex fibre links were installed between 2 cabinets on the ground and one on the first floor.
WNS were recommended to undertake this project because they had successfully installed 639 ADC Krone Cat 6 cables during the previous refurbishment some 18 months ago.
Working closely with S4C Television I.T. staff the project was completed on time with minimum disruptin to the smooth running of the television studio staff.

READ MORE >>
July 2011 - Public Sector - Government Office refurbishment
July 2011 - Public Sector - Government Office refurbishment

During the past 18 months WNS has installed structured cabling at the QED building as part of a phased refurbishment programme.
New Multicores and fibres were installed from the central server room to four wings of the two storey building, with new cabinets located at each wing. 
At the server room the existing voice panels were removed and replaced with Brand Rex 50-port panels, to minimize disruption this work was undertaken during a weekend.
Regular progress meetings were held with the Government representative, consultants and the main contactor to ensure that each phase was completed on time with minimum disruption to the office staff. 
Two more wings have recently been completed bringing the total quantities installed to:
• 11,360 metres of Brand Rex Cat 5 cable.
• 55,600 metres of Brand Rex Cat 6 cable.
• 600 metres of Brand Rex 16 core optical fibre cable.
• 500 metres of 100 pair multicore cable.
• 500 meters of 50 pair multicore cable.
• 7 x 47U Prism cabinets.

READ MORE >>
June 2011 - The X Factor - Sony London Offices
June 2011 - The X Factor - Sony London Offices

WNS have successfully completed the installation of an AMP Netconnect cabling system in the London Sony offices which included the prestigious office of Simon Cowell.

READ MORE >>
May 2011 - Private Sector - Law firm Fibre Optic upgrade
May 2011 - Private Sector - Law firm Fibre Optic upgrade

WNS have successfully completed the optical fibre backbone infrastructure upgrade between two London offices of a major international law firm based at London Bridge. WNS were tasked with removing the existing OS1, OM1 & OM2 links and replacing them with approximately 1.5km of new Brand Rex OS2 & OM3 optical fibre cable. This upgrade was required to meet the demands of a modern day office environment as the business expands and data transfer speed rates become more critical. The project involved meticulous planning and tight timescales to ensure that the business was not put at any risk. The project was completed on time with positive reports posted by all involved on the client’s IT team with whom WNS were working closely with throughout the project.

READ MORE >>
April 2011 -Brand Rex - Value Added Reseller Renewal
April 2011 -Brand Rex - Value Added Reseller Renewal

WNS are proud to announce the renewal of their Brand Rex Value added Reseller (VAR) status for another year.

READ MORE >>
March 2011 - ADC Krone Approved Installer status renewed
March 2011 - ADC Krone Approved Installer status renewed

WNS are proud to announce the renewal of their ADC Krone Approved Installer status for another year.

READ MORE >>
February 2011 – Public Sector - Olympic Stadium
February 2011 – Public Sector - Olympic Stadium

WNS have successfully completed the installation of 1200 no. Brand Rex CAT6 outlets / 45,000m of blown fibre diversely routed / CAT6 copper backbone links / 31 no. equipment cabinets and voice backbone at the Olympic Stadium in Stratford. WNS were awarded this prestigious project by a national electrical contractor.

READ MORE >>
January 2011 - WNS qualify for Constructionline H&S scheme - 3rd year
January 2011 - WNS qualify for Constructionline H&S scheme - 3rd year

WNS have passed the Constructionline pre-qualification process for the third year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.

READ MORE >>
December 2010 - WNS Qualify for the SAFEcontractor Health & Safety scheme
December 2010 - WNS Qualify for the SAFEcontractor Health & Safety scheme

WNS has passed the pre-qualification process for the SAFEcontractor scheme.

About SAFEcontractor -
With more than 150 major clients and almost 18,000 contractor members, SAFEcontractor is the fastest growing health and safety assessment scheme in the UK.
As a leading health and safety pre-qualification assessment scheme, we are dedicated to promoting higher standards of competence and compliance through the provision of relevant industry specific and tailored health and safety assessments for all professions and sectors.

READ MORE >>
December 2010 - Financial sector - European office upgrade
December 2010 - Financial sector - European office upgrade

WNS have successfully completed the installation of 236 no. Systimax CAT6 outlets and backbone cabling for an American Bank in Rome, the installation was completed within 1 week including the user migration to the new cabling system. WNS were awarded the project by a Hertfordshire based IT company because we are their preferred Structured cabling service partner and are now entering the 12th year of this partnership

READ MORE >>
November 2010 - Public Sector - Infrastructure upgrade
November 2010 - Public Sector - Infrastructure upgrade

WNS have now entered their third year of a relationship with a local government over which time we have had continual presence on site. During this period WNS have been engaged in the upgrade of the LAN infrastructure from legacy CAT5 & OM1 to Brand Rex CAT6 plus & OM3. As part of this process we are upgrading the legacy telephony cabling to integrate with the new cabling system. As the infrastructure replacement continues, our role on site has expanded to include the daily support of new new infrastructure alongside the resident IT team.

READ MORE >>
October 2010 - Financial sector - New Data Centre
October 2010 - Financial sector - New Data Centre

WNS have successfully completed the installation of 230 no. Systimax CAT6a 24 port copper panel to panel and harness links and 96 no. equipment cabinets for a large Financial institution in their new Data Centre in London. The installation was completed on time within a 6 week programme. WNS were awarded the project by a large London based IT company because we are their preferred Structured cabling supplier and are now entering the 14th year of this relationship.

READ MORE >>
August 2010 - Financial sector - European project
August 2010 - Financial sector - European project

WNS have successfully completed the installation of 1356 CAT6 Systimax outlets / 124 fibre optic links & 96 copper backbone links for a major Bank in Amsterdam. All fly leading, patching & user migration was also completed by WNS.

READ MORE >>
July 2010 – Paul Hunter RCCD joins WNS’s Business development team
July 2010 – Paul Hunter RCCD joins WNS’s Business development team

WNS are pleased to announce that Paul Hunter has joined the Business Development Team.
Paul brings a wealth of knowledge with over 15 years experience in the IT industry including design and estimating, sales & marketing. Paul will be involved with the expansion of our customer base and developing and maintaining relationships with our distributors, manufacturers and clients.

READ MORE >>
May 2010 - Financial Sector - European project
May 2010 - Financial Sector - European project

WNS have successfully completed the installation of 2600 ADC Krone CAT6 horizontal outlets, cabinets, fibre optic & copper backbone for a leading bank in conjunction with a large London based IT company. This was completed within a refurbishment programme in Vilnius, Lithuania & Prague Czech Republic.

READ MORE >>
April 2010 -Brand Rex - Value Added Reseller
April 2010 -Brand Rex - Value Added Reseller

WNS are proud to announce that Brand Rex have promoted WNS from Approved installer to Value Added Reseller (VAR) status due to continual growth in the market place.

READ MORE >>
March 2010 - ADC Krone Approved Installer status renewed
March 2010 - ADC Krone Approved Installer status renewed

WNS are proud to announce the renewal of their ADC Krone Approved Installer status for another year.

READ MORE >>
February 2010 - Utility Sector - Data Centres
February 2010 - Utility Sector - Data Centres

WNS are currently installing an ADC Krone structured cabling infrastructure into 4 new data centres located in London and the East of England. WNS have completed 2 of 4 data centres with DC3 immininet. The project is due to be completed in Q4 of 2010 with the rollout of the new services to follow immediately. WNS were selected to deliver this project because they are a preferred SCS supplier for this company and are now entering the eighth year of this relationship.

READ MORE >>
January 2010 - WNS qualify for Constructionline - 2nd year
January 2010 - WNS qualify for Constructionline - 2nd year

WNS have passed the Constructionline pre-qualification process for the second year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.

READ MORE >>
December 2009 - WNS are proud to be awarded the Achilles UVDB verified status.
December 2009 - WNS are proud to be awarded the Achilles UVDB verified status.

WNS have been awarded the Achilles UVDB verification. The Achilles UVDB verification audit and assessment focuses on risk critical issues and provides demonstrable compliance to Safety, Health, Environment & Quality (SHEQ) requirements. The qualification is assessed annually to ensure that the high compliance standards are continually met. 
WNS are one of a very select few Structured cabling companies to be verified by Achilles UVDB.

READ MORE >>
September 2009 - Media Sector - Large media company
September 2009 - Media Sector - Large media company

WNS have successfully completed the installation of 600 ADC Krone CAT6 horizontal outlets, cabinets, fibre optic & copper backbone. This was completed with minimum disruption to the business within a live office environment as existing communications room was being redeveloped into an office area

READ MORE >>
July 2009 - Financial Sector - Major Banks offices in Europe
July 2009 - Financial Sector - Major Banks offices in Europe

WNS have successfully completed the installation of 1822 CAT6 Systimax outlets / 528 fibre optic links & 1032 copper backbone links for a Major Bank in Frankfurt, the project was split into 4 phases to enable the smooth migration of users on to the new cabling system. WNS were chosen to deliver this project by a large London based IT company because they have built a long standing partnership over many years and have vast experience working in Europe.

READ MORE >>
August 2009 - Utility Sector - Large Energy Provider
August 2009 - Utility Sector - Large Energy Provider

WNS have successfully completed the installation of over 1600 CAT6 ADC Krone outlets plus cabinets / copper and fibre backbone as part of an office refurbishment project in West Sussex for a large Energy provider.

READ MORE >>
June 2009 - Hospitality Sector - Large Hotel chain
June 2009 - Hospitality Sector - Large Hotel chain

WNS have successfully completed the installation of 312 Excel Cat5e outlets / cabinets & backbone cabling for a large Hotel chain.

READ MORE >>
June 2009 - Public Sector Regional office
June 2009 - Public Sector Regional office

WNS have successfully completed the installation of 3029 Cat6 (125 miles of cable) Connectix pre-terminated cables, plus 2000m fibre optic and 2100m voice cable backbone within timescale for a new Government regional office.

READ MORE >>