WNS have carried out the installation of evoko meeting room manager hardware over 5 floors of a client’s site in London. All had network connections provided & all works were completed out of hours to avoid any disruption to the business.
WNS have been engaged to support sites in Dublin, Galway & Cork for a large innovations company as & when required to provide patching services, phone deployment & fault fixing.
WNS engineers have been busy installing structured cabling across multiple floors and sites for a client in Paris.
A team of WNS engineers recently installed a new structured cabling system in a clients office in Birmingham. The engineers migrated the staff on to the new cabling system over 2 weekends to minimise disruption to the clients operational services.
WNS have recently installed new cabling infrastructure to a clients offices in Vienna & Brussels. This included all patching, phone & PC deployment.
WNS have been in engaged in a multi-site WIFI upgrade project including additional cabling & patching as necessary for a large banking corporation. Most of the work was completed out of hours so as not to cause any disruption to the workplace. Sites included, Belfast, Cheltenham, Bristol, London, Brighton, Aylesbury & Dartford.
WNS engineers have recently completed the installation of 600 Cat6 & Cat6A outlets at a new office building in Birmingham.
A team of WNS engineers recently removed the existing cabling and installed a new Cat6 cabling system at an office in Plymouth. All works were completed over a weekend to minimise disruption to the staff.
WNS engineers have recently completed the installation of 40 additional outlets across multiple floors at an office in Ipswich.
A team of Whitepack engineers have recently completed the installation of 205 wireless access points at a new student accommodation block in Nottingham. Upon completion we submitted an asset register to the client detailing the access points MAC addresses, room locations, outlet and switch port identification numbers.
WNS engineers recently completed a site decoms project in Gillingham, Kent. The project involved removing existing cabinets, cable and equipment.
WNS engineers recently enjoyed a road trip to Lisbon, Portugal. The engineers drove from London to Scotland to collect the network switches and then another 2 days of travelling in the van across France and Spain into Portugal to deilver the switches to Lisbon. The engineers also assisted with a cabling installation project at a site in central Lisbon.
We recently deployed an engineer on a Saturday as an emergency call out to splice and test a 12 core fibre at a site in Winchester.
WNS have recently completed the installation of 900 CAT6A STP high level outlets plus 2500 metres of fibre optic backbone, cabinets switches, APs & UPS in a large pharmaceutical distribution facility in West London.
WNS have recently completed a project at a Datacentre in Hillingdon: Auditing cabinets, general data hall clearance work, cab builds, changes and removals as required.
WNS engineers recently enjoyed a road trip to Milan installing additional cabling for wireless access points in a distribution depot.
A team of WNS engineers recently worked 3 weekends in a row to complete a structured cabling project at an office in Reading. The project was completed out of hours to minimise disruption to the clients staff.
WNS are celebrating installing the LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 13 years. This status was extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.
WNS engineers recently completed the installation of 30 additional Cat6 outlets for a clients office expansion project in Dartford.
WNS recently completed a small structured cabling installation as part of an office refurbishment project in Barrow in Furness.
A team of WNS engineers worked 6 weekends straight on a user migration project in London. The engineers migrated up to 100 desks per weekend including re-locating outlets, re-testing existing cabling and re-patching.
WNS engineers recently enjoyed a week in Amsterdam installing 50 Cisco switches and 650 fibre patch cords in a clients datacentre. On completion we provided the client with a patching schedule and photos of the finished installation.
The installation was a mirror image and synchronized with the installation in Slough.
WNS engineers recently completed the installation of 50 Cisco switches and 650 fibre patch cords in a clients datacentre. On completion we provided the client with a patching schedule and photos of the finished installation.
The installation was a mirror image and synchronized with the installation in Amsterdam.
WNS recently deployed an engineer on a Saturday to a site in Winchester. The scope was to splice and test some newly installed diversely routed 8 & 4 core fibre optic cables providing the client with a more resilient network.
A team of WNS engineers recently consolidated a customers existing network. The scope was relocating outlets including re-terminating and testing then re-patching the users. All works were completed out of hours to minimise disruption to the staff.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 10th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS are currently installing 1300 CAT6A STP outlets plus copper and fibre optic backbone links & cabinets across two buildings at a research facility site in West London.
WNS deployed an engineer to upgrade a wireless access point and switch at a wind farm in Cornwall. On completion of the works the engineer called the clients support dept to confirm the new kit was live and working correctly.
WNS engineers recently completed a high level cabling installation using scissor lifts for additional wireless access points and user outlets in an industrial unit in Birmingham. The project was completed out of normal working hours to minimise disruption to the clients business.
A team of WNS engineers recently completed the installation of 40 additional dual data outlets in an office in Paris. The engineers travelled to paris on Friday evening and completed the installation over the weekend.
WNS deployed an engineer to investigate a faulty outlet at a power station in the South East. Our engineer located the fault and repaired the faulty module and submitted a report to the client.
A team of WNS engineers spent the weekend working in an office in Frankfurt replacing old Wireless Access points and surveying the existing cabling system for a future network expansion project.
WNS are currently involved with the installation of 236 WiFi outlets, patresses, brackets and WAPs to facilitate a staff mobile device rollout for a large establishment in Cardiff.
All works are being carried out after hours and under a strict schedule to ensure company security, facilities management and local staff team leaders are aware of the works planned and being carried out in each particular area on any given night or weekend.
Currently 50% of the cabling and devices are actually tested and in operation and proving a popular upgrade for the staff who have been issued their new devices. The project is 80% complete and is on target to be wrapped up on the 17th of May.
WNS have recently completed multiple cabling projects at Schools across London during the holiday break. WNS deployed 5 teams across the schools for cabling installation ranging from 1 -3 days at each site over a 2 week time slot.
A team of WNS engineers have been bust carrying out survey works in preparation for a staff migration project at offices in Basildon.
WNS engineers had a busy weekend working at a customers site in Munich installing copper and fibre backbone links.
WNS deployed an engineer to investigate a faulty wireless access point in a office in Dublin. Our engineer located the fault and replaced the faulty patchcord, tested all the existing access points within the office and submitted a report to the client.
WNS are currently working on multiple structured cabling installation projects in Wales with lots more due to start throughout this year.
WNS have recently completed the first phase of a 4 year project in Dublin, the scope of works was installing just over 8,000 Cat6a copper and fibre links within a datacentre.
WNS have recently completed the 2nd phase of an office refurbishment project in Luxembourg. WNS engineers installed 1100 Cat6 outlets, copper and fibre backbone links.
WNS have recently completed a small but intricate job for a hotel and spa complex in Carmarthenshire. WNS engineers installed new cables in refurbished rooms for guest network connectivity and tested and repaired some existing network points in the staff areas.
WNS engineers have recently completed the installation of 72 additional Cat6 outlets at an office in Blandford Forum.
A team of WNS engineers have recently completed the migration of 300 staff on to their new network, all works were completed out of hours to minimise disruption to the staff.
WNS have recently completed a project at a Datacentre in Glasgow: Auditing cabinets, general data hall clearance work, cab builds, changes and removals as required.
We are now entering our 3rd calendar year of a phased refurbishment Cat6a installation for a premium brand hotel in Shoreditch. The project has seen many twists and turns leading to re-configuration of the cabling installation + adds and changes as is common on larger installations.
WNS have recently completed the installation of 120 CAT6A horizontal outlets across 2 floors in an office in central London. All works were completed within 4 days as part of the clients refurbishment project.
WNS have recently completed an interesting project in a library in South Wales. WNS engineers relocated existing outlets and installed new outlets to provide network outlets and wifi throughout the building.
WNS have recently completed the installation of 2200 Cat6a F/FTP outlets plus copper and fibre backbone across multiple floors in a building in East London.
WNS have recently completed the installation of 480 Cat6 outlets plus copper and backbone links across 2 floors for a client in Brentwood, Essex. The installation was phased 1st and 2nd fix to fit in with the refurbishment programme.
WNS are currently working on a project at a Datacentre in Bletchley: Auditing cabinets, general data hall clearance work, cab builds, changes and removals as required.
WNS have recently completed a structured cabling refurbishment project for a major financial institution at 3 of their satellite offices in Jersey, Prague & Brussels. Each installation was split into 2 or 3 phases to meet the clients programme.
WNS have successfully completed the installation of Cat6a copper harness and panel to panel links, OM4 fibre links diversely routed, racking servers and upon completion patching all the equipment in a comms room in Bucharest. The project was completed within 3 weeks to meet the clients programme.
WNS engineers have been busy working at weekends on small works projects installing between 2 to 10 high level outlets for wireless access points on sites across the UK. The work was scheduled out of hours to minimise disruption to the clients staff.
WNS have recently been awarded another two floors after successfully completing the first 5 floors of a refurbishment project for a major financial institution in London. Over 2,000 CAT6A U/UTP outlets will be installed following the 10,000 outlets installed in 2017.
WNS have recently completed the installation of 80 dual outlets across 3 floors for a client at their offices in Frankfurt. The installation was completed out of hours to minimise disruption to the staff.
WNS have recently completed the installation of 72 dual outlets across 5 floors for a client at their offices in Luxembourg. The installation was completed out of hours to minimise disruption to the staff.
WNS are celebrating installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 12 years. This status was extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.
WNS have successfully installed, documented & patched 150 new Wireless Access Points in a financial institution across 8 floors over two weekends to avoid any disruption to the business. The old WAP units were also removed.
WNS engineers have been busy since January 2017 working in 9 Data Centre's across the South East of England & Scotland carrying out kit audits, cabinet & cable removal & disposal, kit moves, new cabinet installations, racking & stacking and patching. The project is due to continue throughout 2018
WNS has recently completed the removal of all the existing IT cables from a large office building in London in preparation for the new cabling system to be installed in Q3 2018
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 8th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS have successfully installed 1000 Category 6a Assynia Evo U/FTP cables in a high end hotel in Shoreditch, London. The new structured cabling system willl service the LAN, VOIP and WiFi but will also be serving access control, CCTV and IPTV throughout the complex.
WNS have recently completed the installation of 1100 high and low level Cat6 outlets plus copper and fibre backbone cabling as part of an office refurbishment project in Luxembourg. On completion WNS's engineers migrated the users on to the new cabling system.
WNS have recently successfully completed the installation of 54 x 24 core LC duplex fibre switch links and 72 x 24 core LC duplex panel to panel links in a datacentre in Berkshire. WNS's engineers spliced a total of 4368 fibre ends.
WNS have recently completed a nationwide site roll out. The project was undertaken out of hours at weekends to avoid any disruption to our clients staff. Up to 3 teams of 2 engineers were deployed to sites each weekend installing new cables as required to provide wireless connectivity throughout the offices and workshop areas using boom and scissor lifts to access the cable runs in the high ceilings.
WNS have been engaged to carry out various site enabling services to allow the movement of clients machines from one site to another. This is to facilitate the temporary closure of offices for refurbishment. WNS will work closely with the client to schedule the cabling works that will be undertaken out of hours to avoid any disruption to the staff. All cabling & patching will be documented daily & passed on to the client accordingly.
WNS have recently completed a 6 phase office restructure in Bristol. This involved the installation of 1920 Cat6 Commscope outlets plus copper and fibre backbone links. Once the cabling of each phase was completed WNS engineers worked out of hours to migrate the users on to the new cabling system minimising any disruption to the staff.
WNS have recently installed 1300 CAT6 high level outlets across two buildings during the construction phase along with backbone links between buildings. Whitepack closely liaised with the onsite contracts management team to complete on schedule in an efficient & undisruptive manner.
WNS have recently completed the installation of 130 Cat6 Commscope outlets plus a copper and fibre backbone and cabinets. The installation was completed in phases as part of a refurbishment project and the users were migrated to their new desks within the each phase.
WNS engineers have been busy since January working in 6 Data Centre's across the South East and Home Counties carrying out kit audits, cabinet & cable removal & disposal, kit moves, new cabinet installations, racking & stacking and patching. The project is due to continue into 2018.
WNS have been installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 11 years. This status was extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.
WNS have just completed the installation of a new Brand Rex OM4 fibre optic network to improve a government security system that was failing due to outdated OM1 technology struggling with modern day bandwidth demand placed upon it by recent hardware upgrades. WNS were asked to test the existing fibre cables and provide a report and recommendation of how to solve the issues. It was discovered on the survey that the original fibre technology was OM1 therefore the recommendation to upgrade to OM4 to handle 10Gb was an easy fit. Due to the nature of the works, our SC cleared engineers worked outside normal business hours to install the cabling. The installation saw 500m of OM4 Brand Rex TB fibre installed and spliced to 128 pigtails across 6 locations.
WNS have recently scheduled and completed a nationwide 230 site roll out. The project was undertaken out of normal working hours to avoid any disruption to our clients staff. Up to 5 teams of 2 engineers were deployed to sites each night patching & installing new cables as required to provide network connectivity. Each morning the documentation for each site completed that night was submitted to the client.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 8th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS were engaged by the client to work as part of a service team in a 7 phase office restructure in Swansea. This involved the relocation of cabling network for approximately 60 desks and the installation of new cabling to 20 desks. In total 320 Nexans Cat 6 cables were affected. The programme involved day, night and weekend work times to minimise staff disruption to this busy office.
WNS have recently completed the installation of 1,000 CAT6 U/UTP outlets at a broadcasting company in West London. This included all fibre backbone, switch links, frame & WAP installs. Plus 2000 existing infrastructure outlets were tested, fixed if necessary & validated as this was part of an office consolidation project.
WNS have recently been engaged to diagnose a faulty fibre optic cable which was thought to be limiting the service to 80 network users in a remote building. WNS staff performed extensive testing using an OTDR and determined that the cable had been badly damaged in a collapsed duct. The original fibre was of OM1 internal construction and therefore not suitable for a duct or consideration for repair. WNS have subsequently replaced the fibre with a new 12 core Brand Rex OM4 Loose tube duct grade cable which has restored full network connectivity to the building.
WNS have recently completed the installation of 3,000 Cat6a F/FTP outlets over 4 floors, plus an extensive fibre & copper backbone and all MER interlinks at a new research facility in Oxfordshire.
WNS recently completed the installation of 700 excel Cat6 outlets over 3 floors in an occupied office environment in Bedfordshire. All works were completed on time as per programme.
WNS have successfully installed 202 Cat6 outlets across a school in the South East. The installation was completed within the timescales to meet the refurbishment project deadlines.
WNS have successfully installed 397 Cat6 outlets, cabinets and copper and fibre backbone links in offices located in Stockholm. The engineers completed the installation within a 10 day trip.
WNS have been installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 10 years. This status was extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.
WNS have recently successfully completed the first 5 floors of a refurbishment project for a major financial institution in London. Over 10,000 CAT6A U/UTP outlets were installed within the project timescales.
WNS have recently completed the installation of 600 CAT6A F/FTP horizontal outlets in London for a major interactive software company. This is the first phase of two to be undertaken to avoid any disruption to the clients business as usual.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 7th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS have successfully completed the installation of 350 TE CAT6 outlets at a hospital in the South East as part of a phased ward refurbishment project.
WNS have successfully completed a structured cabling project for a UK client at their offices in Zurich. WNS engineers installed 104 Cat6 outlets, 5 copper backbone links, cabinets and frames within a 5 day trip to meet the clients timescales.
WNS successfully completed a structured cabling project for a UK client at their offices in Vienna.
WNS engineers installed 140 Cat6A Commscope outlets at high level for AV, security and user outlets. The project was completed within 6 days to meet the clients timescales.
WNS have successfully scheduled and completed a 340 site wifi roll-out project within 14 weeks to meet the customers timescales. WNS's engineers installed the cabling infrastructure and 2 to 6 wireless access points on each site depending on the size of the building. Each morning the documentation for each site completed that night was submitted to the client.
The installation was completed out of normal working hours because some of the WAP's were located in public areas.
WNS have successfully installed a new structured cabling system in 64 sites throughout 2015 as part of an ongoing refurbishment project for a client with nationwide offices. Each site was completed on time working to the clients program which ranged from 1 weekend to 5 or 6 week to fit in with the builders refurbishment works, all the installation works were completed out of normal working hours. The staff were migrated on to the new cabling system during the phased installation and the existing cabling system was decommissioned.
WNS successfully completed the installation of 1016 Cat6 Brand Rex UTP cables fed from 3 zones. A new Prism 47u 800 x 800 cabinet was installed in each zone and was fed by a 16 core fibre and 150 pair voice links from the MER.
The installation was completed within very tight timescales to suit the clients program of works.
WNS have successfully completed the installion of a new structured cabling system for an international finance company over 2 sites simultaneously in the South East.
WNS installed 4,000 Cat6a horizontal outlets, fibre & copper backbone, data centre links & all the client migration patching.
WNS have recently completed 340 site surveys for a wifi installation rollout project starting this week that will be completed within 3 months.
WNS successfully complete a Brand Rex Cat6 structured cabling installation in Cardiff
- 3 x 47U cabinets.
- Extend existing 16 core fibres to each new cabinet.
- Extend existing multicore cables to each new cabinet.
- Install 16 Cat 6 links between cabinets.
- Install 654 Cat 6 outlets to floor boxes.
Well done to the Ely Rangers junior team this season, PROUD to sponsor you.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 6th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS is proud to announce we have passed the Constructionline pre-qualification process for the seventh year running. Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.
WNS has recently completed the removal of all the existing IT cables across 6 floors of a large office building in preperation for the new cabling system to be installed in Q1 2015.
WNS have successfully completed the installation of 1,200 Commscope CAT6 horizontal outlets plus backbone & links at a major credit card company in Peterborough
WNS are proud to be sponsoring the Ely Rangers junior team for the 2nd consecutive season.
Photo of the team in their new kit with WNS project manager John Kelly.
WNS have been engaged by a major UK energy supplier to carry out the IT cabling restructure in conjunction with the major refurbishment of the clients national control centre in Suffolk. This project is planned to take approximately 6 months and involves the relocation of staff in phases from the control centre to temporary premises to allow for the refurbishment works to take place in each respective area. WNS are required to fit out the temporary premises with a suitable LAN infrastructure along with the moving, adding to and changing of the existing infrastructure in the control centre to suit the revised office and desk plans. All new and existing LAN infrastructure cabling is TE branded keeping in line with the clients stringent quality requirements.
WNS have installed 300 Cat6 outlets, 2 x 47U cabinets, fibre & multicore links to three floors of a government building in Carmarthen, this was to establish a decant area in the building. Cat6 cabling , 8 x cabinets fibre & multicores links will then be installed throughout the 3 floors on a scheduled programme of work.
WNS have successfully re-located an existing cabinet, including 200 Cat6 cables, fibre & multicore links at a government building in Aberystwyth.
WNS have installed 286 Cat6 cables to a hospice located in Hereford.
WNS have completed the installation of a new structured cabling system for the new HQ of a large car manufacturer in West London.
WNS installed 1,200 horizontal outlets, fibre & copper backbone all within the clients project plan with no issues.
WNS have been installing Brand Rex LAN infrastructure cabling for a South West London local authority as a preferred supplier for the past 8 years. This status has now been extended to all sites & campuses that the authority holds governance or affiliation with. This has resulted in a growth in work load, territorial coverage and resource requirement at WNS resulting in the formation of a dedicated team who now cater for the clients requirements rather than the previous BAU status which was dealt with “as and when required”.
WNS has successfully completed a wifi cabling installation across 340 sites within 3 months, the installations were completed out of normal working hours with up to 5 teams completing 3 sites each per night.
WNS have been awarded another 2 floors at a UK airport because we successfully delivered a similar size project in late 2013.
We are to install over 3,000 horizontal TE Connectivity CAT6 outlets, fibre & copper backbone within the building over a 12 week project.
We will be installing all cabling out of hours to limit disruptions to other trades.
WNS have been engaged to provide a new campus LAN for a major utility company site restoration project in South London. This project will take place over the next 9 months and involves the installation of approximately 4km of duct grade TE OM3 optical fibre cable and over 600 category 5e UTP network outlets. The optical fibre backbone will serve the LAN and CCTV system which is extensive across this large site and the UTP outlets will be split across 3 buildings one of which is a new build.
WNS has added the Fluke DSX5000 to our range of cable analysers.
WNS has been awarded a contract to test the optical fibre backbone network across a government airbase.
WNS has been awarded the next phase of a government building refurbishment. The project involves the installation of 1,500 Brand-Rex Cat6 outlets to floor boxes throughout the 4th floor west & south wings. The cables will be routed to 6 No new 47U cabinets. The existing 16 core fibres that originally served the old redundant cabinets will be re-routed and extended (via fusion splice boxes) to their new locations. The original 100-pair multicore cables that also served the old cabinets will also be re-routed and extended (via box cons) to their new locations.
WNS Network Services has passed the rigorous qualification process to continue it's UVDB verification status.
About UVDB (powered by Achilles)
We are a leading global provider of integrated supplier management and supply chain solutions.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety for the 5th year running.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS is proud to announce we have passed the Constructionline pre-qualification process for the sixth year running. Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.
As part of a staff consolidation process from rented office space to owned office space, one of the UK’s largest power distribution companies has committed to the re-furbishment of one of their buildings in Camden, North London. The fit-out will take in five floors of owned office space which will be bought up to modern day standards from its current 1950’s décor. WNS have been engaged to supply and install a new TE structured cabling system to include up to 800 LAN sockets and an OM3 optical fibre backbone between communications rooms. WNS are helping with the cabling and containment design by providing the services of their RCDD staff member to ensure the installation meets current international and European Standards. Building works have begun on site and it is anticipated that WNS will be required on site to begin cabling towards the end of February 2014. The client’s staff are due to move in in early July 2014 and WNS will provide staff to assist with the relocation of personnel and their IT kit from the rented office space as part of an overall service.
As part of a major electrical substation upgrade directly related to the crossrail project, WNS have been appointed to install new Connectix category 6a cabling throughout the premises for LAN and voice connectivity. The substation has 5 sub level floors and 2 comms rooms which WNS will link together with OM3 fibre and voice connections. This site is extremely high profile and is subject to the most challenging health and safety restraints due to the nature of the premises. WNS are on target to complete this work on time and on budget.
WNS Network Services is very proud to sponsor the Ely Rangers under 8's team.
Looking very smart in their new kit.
WNS has recently completed a CCTV installation for a residential block in Tower Hill, London. The cameras installed range from entry level analogue units to ingress protection rated High Definition internet protocol cameras with integrated heating circuits to prevent moisture during the wet winter months. The majority of the cameras used were supplied by Genie CCTV systems with whom WNS have now formed a partnership. WNS have installed a whole new TE UTP infrastructure to serve the cameras which is completely contained in a combination of PVC and steel galvanized conduit whose junction boxes are fitted with tamperproof security screws. To capture the recordings of the camera network a new 2TB AVER hybrid network video recorder capable of handling a combination of 20 analogue and IP cameras was installed. The NVR connects to a network switch supplied and installed by WNS to allow for the IP cameras to function. All active kit is connected to the internet via a new BT broadband circuit to allow the customer to view and interrogate the system remotely from any PC, Android, IPhone or Ipad device.
WNS is proud to announce it is sponsoring the Ely Ranger under 8's football team.
Ely Rangers Association Football Club are a Welsh Association football team founded in 1965. They are based in Ely, Cardiff and they play at Station Road.
WNS are currently undertaking the refurbishment of 2 floors within an office building in Cardiff Bay.
Due to the sensitivity of the offices and the security 90% of the work was carried out outside of normal working hours.
Follow WNS on Twitter - https://twitter.com/WhitepackNS
@whitepackNS
WNS are proud to be associated with Brand Rex as they recently announced that their global organisational and operational activities achieved Carbon Neutral Status in accordance to PAS2060 - a new carbon neutrality standard launched by the British Standards Institute (BSI), developed with input from government, public and the private sector.
WNS engineers have recently completed their Brand-Rex Design and technician refresher courses.
WNS recently completed an installation for a UK Energy distributor, providing WIFI connectivity for staff over 6 floors of the Company HQ building in London. WNS Engineers installed a total of 50 Cat5e UTP cables supplying 2 outlets per WIFI device (one cable for primary use and the secondary as a backup) Engineers installed 25 Cisco WIFI Access Points mounting them to the ceiling grid within their given areas of use.
WNS is currently surveying multiple sites across the South of England & Wales for a Wifi connectivitiy installation project, the wireless access points will be installed out of normal business hours in July and August. The Wifi connectivity will enable the client to offer a more flexible service within it's sites.
WNS London based project manager Leigh Marshall has completed his Substation Entry Level Training Course. The training was undertaken due to the large number of structured cabling projects WNS undertake within this sector and the need to increase our number of management staff and engineers with Certificates of Competence for carrying out work activities in substations.
WNS continue to build & strengthen their relationship with a London based Production Company and is currently carrying out the following works on one of their sites in London.
- Structured Cabling ‘Health Check Remedy’ – following recent testing onsite, WNS are replacing a number of faulty or broken data outlet modules and shutters, rectifying faults & re-testing failed outlets on their existing network.
- Supply & installation of a new structured cabling system in one of the departments
- Supply & installation of a Fibre Optic Single Mode Patch Lead uplink between the Ground & 3rd Floor Comms Rooms to improve connectivity
WNS have been awarded the contract to undertake the installation of 3 No new 42U cabinets, 700 Brand Rex Cat6 outlets, new fibre and multicore links between floors for a Government Office in Mid Wales.
The contract was awarded after WNS attended various site surveys and planning meetings. Some phases of the project will be undertaken outside of normal working hours to minimise disruption to the staff.
WNS have recently engaged with a new client in central London. The client is a prestigious college who currently occupy a number of listed buildings which require a great deal of thought and care even for the smallest installations. WNS recently completed a 4 day project which involved fitting out one of the buildings with a new Excel structured cabling solution. Every outlet on this job required containment of some description to achieve a discrete finish that blends in with the building surrounds. This project was completed on time and within budget and has provided a solid foundation for our new relationship going forward.
WNS have completed an installation in central London for a major UK Energy provider comprising of 336 TE Cat5e LAN outlets and a sprinkling of wireless access points. Due to an aggressive time scale and noise restrictions on this project, WNS staff were required to complete a good deal of the work outside of normal business hours. To achieve authorisation for out of hours works, dispensation and permits were required and arranged in advance with the building manager. The end result was a happy customer and a satisfied building manager.
WNS is currently involved in a large rollout project providing LAN connections for clocking in/out Kiosk Machines. The Kiosk Machines are used by staff to log-in and enter their details when they arrive and leave the premises.
WNS recently completed an installation for a UK Energy provider which involved providing a LAN connection for an Orange Mobile Aerial Booster and the supply and installation of TE Connectivity Cat5e UTP cables for a Portakabin Meeting Room.
WNS are currently involved in a project at a prestigious law firms London Offices.
WNS engineers are working night shifts to convert & relocate information outlets throughout the building ensuring connectivity before the staff returned to their new desk position in the morning.
WNS has successfully completed a new structured cabling installation at a site in the South East. The project was for the refurbishment of the Measuring & Calibration Centre providing the following:
- 1 x 42U Cannon Smart Data Cabinet
- 246 x UTP Cat5e TE Connectivity LAN outlets
- 4 x UTP Cat5e outlets (for WIFI Connectivity)
- 2 x 12core OM3 fibre links from Main Building & IT Stores to MCC Building
- 100pair CW1308 voice link from Main Building
WNS have completed a Network cabling Infrastructure Health Check across four floors for a Production Company based in London.
WNS are currently involved in a site roll out project for a UK Energy provider within the East and South of England, including the London area.
The project is to replace Sub Station Entry Keys with a Digital Key to allow the business to control the access to its sites through restrictions and monitoring. WNS are involved providing a LAN connection to a modem that controls a Digital Key Reading Device. The Key Reader is used by staff to register and then regularly charge their new Digital Keys for access to their designated sites.
WNS has been awarded accreditation from safecontractor for its commitment to achieving excellence in health and safety.
safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.
The company’s application for safecontractor accreditation was driven by the need for a uniform standard across the business.
WNS take our engineer Health & Safety training very seriously - IPAF / PASMA / First Aid / CSCS / SMSTS / SSSTS / Asbestos awareness & Confined space training
WNS Network Services have successfully completed the installation of 1,472 Brand Rex Cat6 outlets, 3no. new 47u cabinets, relocation of 2no. existing cabinets, 5no. 16 core fibre optic cables and 5no. 100 pair CW1308 voice backbone cables. All client expectations were met.
WNS are pleased to announce that Kevin Ward has returned to us after a year off travelling the world. Kevin has taken up where he left off as a Project Manager and he will be based in West Somerset overseeing projects across the South of England and Wales.
WNS are proud to announce that Kevin Ward is now a qualified BICSI Registered Communications Distribution Designer (RCDD)
WNS Network Services are proud to announce the launch of their new website and logo. We would like to thank Sinclair Knight for all their help designing and launching the site.
Brand-Rex Select Partner Whitepack Network Services has recently completed a project to successfully design and install a Brand-Rex Cat6Plus system into the Welsh governments new office in London.
The office in the building of the former headquarters of the Conservative Party in Victoria Street, London required a reliable network capable of running the latest technologies such as video and web conferencing as well as providing staff with high-speed internet access.
Prior to commencing the installation, Whitepack Network Services assisted with the IT infrastructure design, recommending a Brand-Rex Cat6Plus solution to ensure the new network infrastructure would meet the needs of the Welsh government.
The office, officially opened at the end of July by the Welsh First Minister.
New Product – CAT6PLUS F/UTP Boxed Cable
Brand-Rex is delighted to launch the first ever Cat6Plus F/UTP data communication cable in 305m boxes using REELEX® tangle free, easy pull packaging technology. The combination
of boxed cable and REELEX® packaging now make it easier for users to manage, handle and install the cable on site.
The new installer friendly boxed cable eliminates the need for cable reel stands on site and the robust packaging and ergonomic box design ensures this shielded cable is now easier than ever to handle, transport and to stack and store.
Cat6Plus is the best performing Category 6 / Class e products available on the market today. This premium grade shielded cable support gigabit ethernet protocols and is ideal for installation in horizontal or building backbone areas.
Brand-rex Partner whitepack network services have successfully designed and installed a cat6Plus system for the newly refurbished Welsh Assembly Government buildings in Cardiff. WNS were appointed to manage the design and install by fujitsu last year.
The buildings at Cathay’s Park, Cardiff required a reliable network capable of running the latest technologies such as video and web conferencing as well as providing staff with high-speed internet access. Prior to starting, WNS assisted with the IT infrastructure design and made recommendations to ensure the new network infrastructure would best meet the needs of the Welsh Assembly Government. The existing Category 5 cabling was stripped out from beneath the raised floors then replaced with the Cat6Plus system. The optical fibre patch panels were then replaced with new Brand-Rex patch panels and the existing optical network reconfigured using fusion-splicing onto pre-terminated multimode pigtails and ST connectors to reduce signal loss and deliver higher transmission speeds.
The project involved over 1,500 cables and 408 quad outlets to floor boxes with a combined length of more than 55,000m.
WNS has successfully completed the Installation of 1,034 Cat6 Brand-Rex outlets, backbone cabling and Prism cabinets in Wales for a local government
WNS have installed a wireless network in three Power stations located in the South East of England enabling remote and flexible access for staff.
WNS are pleased to announce Leigh Marshall has joined the Project Management team.
Leigh was previously a Senior site supervisor for WNS with 10 years experience in the IT industry. Leigh will be involved with managing structured cabling installation projects & maintaining relationships with our clients & Suppliers.
WNS has passed the pre-qualification process for the SAFEcontractor scheme.
About SAFEcontractor -
With more than 150 major clients and almost 18,000 contractor members, SAFEcontractor is the fastest growing health and safety assessment scheme in the UK.
As a leading health and safety pre-qualification assessment scheme, we are dedicated to promoting higher standards of competence and compliance through the provision of relevant industry specific and tailored health and safety assessments for all professions and sectors.
TE Connectivity is a global, $12.1 billion company that designs and manufactures over 500,000 products that connect and protect the flow of power and data inside the products that touch every aspect of our lives.
As a world leader in network infrastructure, TE Enterprise Networks develops solutions for data critical applications in buildings, on campus and within data centers TE Enterprise Networks brings together the best from AMP NETCONNECT and ADC KRONE to help you ensure that your network never lets you down by providing tailor-made solutions to match your business no matter where your operations are based.
WNS have passed the Constructionline pre-qualification process for the fourth year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.
WNS have successfully completed the installation of 512no. Brand Rex Cat6 cables, plus fibre optic and voice cable backbone within timescale for a Government regional office.
WNS have successfully completed the installation of 165no. wireless access points across 18 floors of two buildings. All the work was completed out of normal business hours. The project involved meticulous planning and tight timescales to ensure that the business was not put at any risk. The project was completed on time with positive reports posted by all involved on the client’s IT team with whom WNS were working closely with throughout the project.
WNS are pleased to announce that John Cunningham has joined the Project Management team.
John was previously a Senior site supervisor for WNS with 17 years experience in the IT industry. John will be involved with managing structured cabling installation projects & maintaining relationships with our clients & Suppliers.
WNS recently installed ADC Krone Cat 6 cabling and Brand Rex optical fibre cables at S4C Television centre.
134 Krone Cat 6 outlets were installed from a new cabinet to floor boxes and dado trunking on the ground floor. The existing 40 Cat cables were disconnected and re-routed to new locations, 4 x 12 port Cat 6 harness links were installed between the new cabinet in the Edit Car Room.
16 core OM1 Brand Rex fibre links were installed between 2 cabinets on the ground and one on the first floor.
WNS were recommended to undertake this project because they had successfully installed 639 ADC Krone Cat 6 cables during the previous refurbishment some 18 months ago.
Working closely with S4C Television I.T. staff the project was completed on time with minimum disruptin to the smooth running of the television studio staff.
During the past 18 months WNS has installed structured cabling at the QED building as part of a phased refurbishment programme.
New Multicores and fibres were installed from the central server room to four wings of the two storey building, with new cabinets located at each wing.
At the server room the existing voice panels were removed and replaced with Brand Rex 50-port panels, to minimize disruption this work was undertaken during a weekend.
Regular progress meetings were held with the Government representative, consultants and the main contactor to ensure that each phase was completed on time with minimum disruption to the office staff.
Two more wings have recently been completed bringing the total quantities installed to:
• 11,360 metres of Brand Rex Cat 5 cable.
• 55,600 metres of Brand Rex Cat 6 cable.
• 600 metres of Brand Rex 16 core optical fibre cable.
• 500 metres of 100 pair multicore cable.
• 500 meters of 50 pair multicore cable.
• 7 x 47U Prism cabinets.
WNS have successfully completed the installation of an AMP Netconnect cabling system in the London Sony offices which included the prestigious office of Simon Cowell.
WNS have successfully completed the optical fibre backbone infrastructure upgrade between two London offices of a major international law firm based at London Bridge. WNS were tasked with removing the existing OS1, OM1 & OM2 links and replacing them with approximately 1.5km of new Brand Rex OS2 & OM3 optical fibre cable. This upgrade was required to meet the demands of a modern day office environment as the business expands and data transfer speed rates become more critical. The project involved meticulous planning and tight timescales to ensure that the business was not put at any risk. The project was completed on time with positive reports posted by all involved on the client’s IT team with whom WNS were working closely with throughout the project.
WNS are proud to announce the renewal of their Brand Rex Value added Reseller (VAR) status for another year.
WNS are proud to announce the renewal of their ADC Krone Approved Installer status for another year.
WNS have successfully completed the installation of 1200 no. Brand Rex CAT6 outlets / 45,000m of blown fibre diversely routed / CAT6 copper backbone links / 31 no. equipment cabinets and voice backbone at the Olympic Stadium in Stratford. WNS were awarded this prestigious project by a national electrical contractor.
WNS have passed the Constructionline pre-qualification process for the third year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.
WNS has passed the pre-qualification process for the SAFEcontractor scheme.
About SAFEcontractor -
With more than 150 major clients and almost 18,000 contractor members, SAFEcontractor is the fastest growing health and safety assessment scheme in the UK.
As a leading health and safety pre-qualification assessment scheme, we are dedicated to promoting higher standards of competence and compliance through the provision of relevant industry specific and tailored health and safety assessments for all professions and sectors.
WNS have successfully completed the installation of 236 no. Systimax CAT6 outlets and backbone cabling for an American Bank in Rome, the installation was completed within 1 week including the user migration to the new cabling system. WNS were awarded the project by a Hertfordshire based IT company because we are their preferred Structured cabling service partner and are now entering the 12th year of this partnership
WNS have now entered their third year of a relationship with a local government over which time we have had continual presence on site. During this period WNS have been engaged in the upgrade of the LAN infrastructure from legacy CAT5 & OM1 to Brand Rex CAT6 plus & OM3. As part of this process we are upgrading the legacy telephony cabling to integrate with the new cabling system. As the infrastructure replacement continues, our role on site has expanded to include the daily support of new new infrastructure alongside the resident IT team.
WNS have successfully completed the installation of 230 no. Systimax CAT6a 24 port copper panel to panel and harness links and 96 no. equipment cabinets for a large Financial institution in their new Data Centre in London. The installation was completed on time within a 6 week programme. WNS were awarded the project by a large London based IT company because we are their preferred Structured cabling supplier and are now entering the 14th year of this relationship.
WNS have successfully completed the installation of 1356 CAT6 Systimax outlets / 124 fibre optic links & 96 copper backbone links for a major Bank in Amsterdam. All fly leading, patching & user migration was also completed by WNS.
WNS are pleased to announce that Paul Hunter has joined the Business Development Team.
Paul brings a wealth of knowledge with over 15 years experience in the IT industry including design and estimating, sales & marketing. Paul will be involved with the expansion of our customer base and developing and maintaining relationships with our distributors, manufacturers and clients.
WNS have successfully completed the installation of 2600 ADC Krone CAT6 horizontal outlets, cabinets, fibre optic & copper backbone for a leading bank in conjunction with a large London based IT company. This was completed within a refurbishment programme in Vilnius, Lithuania & Prague Czech Republic.
WNS are proud to announce that Brand Rex have promoted WNS from Approved installer to Value Added Reseller (VAR) status due to continual growth in the market place.
WNS are proud to announce the renewal of their ADC Krone Approved Installer status for another year.
WNS are currently installing an ADC Krone structured cabling infrastructure into 4 new data centres located in London and the East of England. WNS have completed 2 of 4 data centres with DC3 immininet. The project is due to be completed in Q4 of 2010 with the rollout of the new services to follow immediately. WNS were selected to deliver this project because they are a preferred SCS supplier for this company and are now entering the eighth year of this relationship.
WNS have passed the Constructionline pre-qualification process for the second year running.
Constructionline is the Uk's largest register for pre-qualification contractors and consultants, in terms of efficiency, time and cost saving and best practice. The qualification process is to Government standard.
WNS have been awarded the Achilles UVDB verification. The Achilles UVDB verification audit and assessment focuses on risk critical issues and provides demonstrable compliance to Safety, Health, Environment & Quality (SHEQ) requirements. The qualification is assessed annually to ensure that the high compliance standards are continually met.
WNS are one of a very select few Structured cabling companies to be verified by Achilles UVDB.
WNS have successfully completed the installation of 600 ADC Krone CAT6 horizontal outlets, cabinets, fibre optic & copper backbone. This was completed with minimum disruption to the business within a live office environment as existing communications room was being redeveloped into an office area
WNS have successfully completed the installation of 1822 CAT6 Systimax outlets / 528 fibre optic links & 1032 copper backbone links for a Major Bank in Frankfurt, the project was split into 4 phases to enable the smooth migration of users on to the new cabling system. WNS were chosen to deliver this project by a large London based IT company because they have built a long standing partnership over many years and have vast experience working in Europe.
WNS have successfully completed the installation of over 1600 CAT6 ADC Krone outlets plus cabinets / copper and fibre backbone as part of an office refurbishment project in West Sussex for a large Energy provider.
WNS have successfully completed the installation of 312 Excel Cat5e outlets / cabinets & backbone cabling for a large Hotel chain.
WNS have successfully completed the installation of 3029 Cat6 (125 miles of cable) Connectix pre-terminated cables, plus 2000m fibre optic and 2100m voice cable backbone within timescale for a new Government regional office.